General, Sub, & Remodeling Contractors (VDC Operations)

What We Do

 We manage project construction risk field parameters through integrated Virtual Design and Construction (VDC) simulations, solving coordination bottlenecks before field installation.

How We Serve You

As-built rendering using detailed Scan-to-BIM point cloud data for retrofits and remodeling extensions.

Execution of 4D construction sequencing timelines to visually monitor multi-tier structural progression.

Extraction of clear 5D quantity take-offs (QTO) for robust material purchasing management.

End-to-End Capabilities for Architects

Design Development & BIM

  • Massing and sketches to Revit conversion
  • Schematic Design (SD) to Design Development (DD) processing
  • Custom Family Creation & Parametric Libraries
  • LOD 200 to LOD 350 Asset Modeling

Construction Documentation

  • High-Fidelity, Clean Permit Drawing Sets
  • Intelligent Wall Sections & Joinery Details
  • Automated Door, Window & Finish Schedules
  • Legacy CAD/Redline to Native Revit Migrations

For Remodeling & Retrofits

  • Laser scan point-cloud to precise Revit transitions
  • As-built deviation tracking for older structures
  • Phased modeling setups for live property expansions
  • Structural layout matching with existing components

Flexible Engagement Blueprints

01

Project-Based VDC Overflow

Best For: Contractors seeking immediate trade model coordination or drawing generation for a fast-tracked build track.

  • Plug-and-play coordination matching project milestones
  • Clear scope tracking with quick turnaround deadlines
  • No long-term staffing constraints or software licensing overhead

02

Dedicated Virtual Staffing

Best For: Busy construction companies looking to handle ongoing backlogs and secure constant VDC resource infrastructure.

  • Dedicated modelers and coordinators tied straight to your pipeline
  • Direct communication channels synced with your operations staff
  • Standardized execution protocols engineered to fit your style

Build Clash-Free. Deliver On Schedule.

Stop wasting field labor budgets on avoidable spatial conflicts. Let us look at your upcoming drawing dependencies and show you how our coordinated VDC engine protects your execution milestones.